Huawei Remote Output Control

Zuletzt geändert von Niels Tiben am 2023/10/17 07:46

See also: https://wiki.eniris.be/wiki/publicinformation/view/Integraties/IEC103%20Huawei/

  1. Clock source: Set NTP.
  2. Server: Set the server IP address or domain name.
  3. NTP synchronization test: Check the time synchronization status.

Set Active power control mode to Remote output control.

1.png

2.png

  • Control area: Set the areas for remote output control. To enable the function in some areas, the license needs to be imported and enabled.
  • Output control duration: Set the time required for the inverter to change its output power from 0% to 100% or from 100% to 0%.
  • PV plant ID: Set the ID assigned by the power company to the SmartLogger.
  • Remote output control server: Set to remotecontrol.eniris.be
  • If the connection between the SmartLogger and the server is abnormal, obtain the output control file in .data format from the website of the power company and import the file.
  • After the SmartLogger connects to the server, you can export the relevant file.

 

 